Home Training midas nGen Tutorials

TIP

*Load- Wind Load

  • 20,450
  • 2016-10-20

*Video Overview

*Balang Island Cable Stayed Bridge is located in East Kalimantan (Borneo) Province, Indonesia, that will connect Balang Island and Tempadung in Balikpapan District. The bridge has main span of 402m, representing longest span concrete bridge of its kind, and total length of 804m.

  • 00:00
    3wpwben9to
    0
    140
    166
    Target Ratio
    1. What has higer priority between the design setting & member parameter?

    2. What dose target ratio mean?
    142
    2017-04-12
  • 00:00
    4f932p1agt
    1
    141
    167
    Moment Redistribution Factor
    1. What is the delta value?

    2. What is the relationship between Xu, delta value and moment redistribution?
    81
    2017-04-12
  • 00:00
    9bcrcwo8rw
    2
    142
    168
    Live Load Reduction Factor
    1. What is the difference of reduction factor between vertical and horizontal members?

    2. How does the reduction factor of vertical member change as the story gets lower?

    3. How does the reduction factor of horizontal member change according to the load area?
    66
    2017-04-12
  • 00:00
    i5nc0samoq
    3
    143
    173
    Tip 04. Angle of the Concrete Struts
    1. How calculate the moment of the maximum shear reinforcement?

    2. How can we find the theta value for economical design?
    28
    2017-06-23