Home Training midas nGen Tutorials

Structural Analysis(Ⅰ) Structure Part

*Load- Wind Load

  • 20,450
  • 2016-10-20

*Video Overview

*Balang Island Cable Stayed Bridge is located in East Kalimantan (Borneo) Province, Indonesia, that will connect Balang Island and Tempadung in Balikpapan District. The bridge has main span of 402m, representing longest span concrete bridge of its kind, and total length of 804m.

  • 07:04
    as2agexnhl
    0
    79
    116
    Summary
    • Define Properties
      > Material, Section
    • Create a Beam
    • Apply Loads
      > Point Load, Beam Load
    • Create Supports
    • Check Analysis Result
      > Reaction, Deformation, Beam Force
    762
    2016-10-18
  • 08:42
    1x4txwxilx
    1
    80
    117
    Summary
    • Define Properties
      > Material, Section
    • Create Members
      > Column, Beam
    • Create Supports
    • Apply Loads
      > Point Load, Beam Load
    • Split Members
    • Create Beam and Release
    • Analysis Results
     > Deformations
     > Beam Forces
    345
    2016-10-18